Commands
| Command | Description |
|---|---|
ATEXPORT_CONDUIT_FILL_SCHEDULE |
Export conduit fill schedule to Excel |
ATREPORT_CONDUIT_FILL_SCHEDULE |
Generate conduit fill schedule in drawing |
Prerequisites
- A FireCAD project must be open
- Segments must have conduit types assigned
Overview
Generates a conduit fill schedule showing conductor counts, wire sizes, and fill percentages for each conduit run. This helps verify NEC conduit fill compliance.
Steps
- Type the command in the AutoCAD command line
- The schedule is generated (Excel file or drawing table depending on command)
Related Commands
FireCAD is the industry-leading AutoCAD add-in for fire alarm system design — from circuit layout to wire routing to code-compliant reports.
Learn more and get started at getfirecad.com →
Inspect Point Integration — Fire alarm system device lists and bill of materials can be pushed directly from FireCAD into Inspect Point, eliminating manual data entry and ensuring every device is ready for inspection scheduling and ongoing asset management.
Learn more here →